home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V12_5 / V12_531.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  19KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/wbDYF9y00VcJQ6Yk5:>;
  5.           Mon, 12 Nov 1990 01:42:18 -0500 (EST)
  6. Message-ID: <EbDYEdW00VcJA6X04N@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Mon, 12 Nov 1990 01:41:46 -0500 (EST)
  12. Subject: SPACE Digest V12 #531
  13.  
  14. SPACE Digest                                     Volume 12 : Issue 531
  15.  
  16. Today's Topics:
  17.   LLNL Astronaut Delivery (was Re: You Can't Expect a Space Station)
  18.              Re: LNLL Inflatable Stations
  19.               Re: "What's New" Nov-2-90
  20.                Clarify Acronyms
  21.        Re: You Can't Expect a Space Station to be Cheap
  22.             Re: Galileo Update - 11/02/90
  23.          Re: Replacement and Insurance Costs
  24.                USAF Robots on the Moon
  25.        Re: You Can't Expect a Space Station to be Cheap
  26.          Re: Replacement and Insurance Costs
  27.  
  28. Administrivia:
  29.  
  30.     Submissions to the SPACE Digest/sci.space should be mailed to
  31.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription notices,
  32.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  33.              tm2b+@andrew.cmu.edu
  34.  
  35. ----------------------------------------------------------------------
  36.  
  37. Date: 5 Nov 90 06:02:59 GMT
  38. From: rochester!sol!yamauchi@rutgers.edu  (Brian Yamauchi)
  39. Subject: LLNL Astronaut Delivery (was Re: You Can't Expect a Space Station)
  40.  
  41. In article <2658@polari.UUCP> crad@polari.UUCP (Charles Radley) writes:
  42.  
  43.    [quoting Alan Sherzer]
  44.  
  45.    +Again, can you be more specific? When McDonnell Douglas says they
  46.    +can cluster Deltas to lift a 100K pound payload for $500M in three
  47.    +years on what do you base your belief that it can't be done? When
  48.    +Martin Marrietta makes similar claims about the Titan, why are they
  49.    +wrong? What error in costing did they make?
  50.    -
  51.    I have no doubt MDAC and Martin can deliver those.   But I am still
  52.    waiting to hear how they or anybody else can build a new re-usable
  53.    manned spacecraft with long stay EVA capability (including robot arm)
  54.    for less than $ 5 - 10 B.  You cannot build LLNL without one, you
  55.    yourself acknowledge the need for contingency EVA, and that is what
  56.    it takes.   Looks cheaper to use the Shuttle for the contingency EVA
  57.    role.
  58.  
  59. I'm not sure that contingency EVA requires a "re-usable manned
  60. spacecraft with long stay EVA capability (including robot arm)".  As
  61. long as the Earth Station maintains integrity, the astronauts should
  62. be able to run EVAs out of it.  Of course, if it doesn't, then they
  63. *are* in deep trouble.
  64.  
  65. On the other hand, Charles Radley does raise an important point here.
  66. How *is* LLNL planning to get astronauts up to the station?  Are they
  67. planning to use the shuttle or develop their own spacecraft?  It
  68. probably wouldn't be too risky to rely on the shuttle for one or two
  69. launches, where it really *is* useful (i.e. launching astronauts).
  70.  
  71. In contrast, the number of shuttle launches that Freedom requires
  72. makes me a bit uncomfortable.  Then again, I could be wrong -- at
  73. least the hydrogen leaks have been fixed...
  74. --
  75. _______________________________________________________________________________
  76.  
  77. Brian Yamauchi                University of Rochester
  78. yamauchi@cs.rochester.edu        Computer Science Department
  79. _______________________________________________________________________________
  80.  
  81. ------------------------------
  82.  
  83. Date: 5 Nov 90 17:25:53 GMT
  84. From: usc!wuarchive!rex!rouge!dlbres10@ucsd.edu  (Fraering Philip)
  85. Subject: Re: LNLL Inflatable Stations
  86.  
  87.  
  88. Ugh! here you go, I don't know the best way to prune this:
  89.  
  90. In article <1990Nov3.194451.11017@engin.umich.edu> sheppard@caen.engin.umich.edu (Ken  Sheppardson) writes:
  91.  
  92. >      aws@ITI.ORG ("Allen W. Sherzer") writes:
  93. >   >In article <44053@eerie.acsu.Buffalo.EDU> you write:
  94. >   >
  95. >   >>On Freedom, everything is simply installed inside the modules before launch.
  96. >   >
  97. >   >At the Midwest Space Development Conference two weeks ago an engineer
  98. >   >on Freedom implied that the modules had to be assembled in orbit. They
  99. >   >are too big/heavy to fit on a single Shuttle flight. However, I didn't
  100. >   >get a chance to ask him if my understanding was correct.
  101.  
  102. >      I believe a the current US Hab/Lab modules are too heavy to launch
  103. >      fully outfitted using the current shuttle.
  104.  
  105. From what I gather, the stripped modules run into problems with
  106. the shuttle senter-of-gravity limits.
  107.  
  108. Phil
  109.  
  110. ------------------------------
  111.  
  112. Return-path: <space-request+@andrew.cmu.edu>
  113. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  114. Date: 5 Nov 90 18:17:49 GMT
  115. From: swrinde!zaphod.mps.ohio-state.edu!samsung!rex!rouge!dlbres10@ucsd.edu  (Fraering Philip)
  116. Organization: Univ. of Southwestern LA, Lafayette
  117. Subject: Re: "What's New" Nov-2-90
  118. References: <90307.164457WTU@psuvm.psu.edu>
  119. Sender: space-request@andrew.cmu.edu
  120. To: space@andrew.cmu.edu
  121.  
  122.  
  123. I found this on sci.physics. Suddenly spending money
  124. on putting inflatable balloons in space looks a lot
  125. less stupid. Look at the Alaskan thing. 
  126.  
  127. p.s.: for those of you who know what I'm talking about, 
  128. _this_ gets money and Paul Koloc doesn't?
  129.  
  130. Phil Fraering
  131.  
  132. In article <90307.164457WTU@psuvm.psu.edu> WTU@psuvm.psu.edu writes:
  133.  
  134.    From: WTU@psuvm.psu.edu
  135.  
  136.    WHAT'S NEW, Friday, 2 November 1990                Washington, DC
  137.  
  138.    1. WALTER E. MASSEY HAS RESIGNED AS VICE PRESIDENT OF THE APS,
  139.    citing his nomination to be the director of the National Science
  140.    Foundation.  Ernest M. Henley, who was just elected to follow
  141.    Massey, will therefore move directly to President-Elect.  Henley
  142.    is director of the Institute for Nuclear Theory at the University
  143.    of Washington, where he has been chair of the Physics Department
  144.    and Dean of the College of Arts and Sciences.  A Berkeley PhD, he
  145.    is a member of the National Academy of Sciences and recipient in
  146.    1989 of the APS Tom W. Bonner Prize in Nuclear Physics.  A
  147.    special election will be held to select a new Vice President.
  148.  
  149.    2. MASSEY'S FIRST YEAR ON THE JOB WILL NOT BE AN EASY ONE; NSF's
  150.    FY 91 appropriation suffered a devastating last-minute cut!  As
  151.    What's New reported (19 Oct 90), a House/Senate Conference agreed
  152.    to an 8.9% increase for NSF research.  Conference agreements are
  153.    usually final--not this time.  The budget summit gave OMB final
  154.    say on scorekeeping.  To salvage as much of the defense budget as
  155.    possible, OMB refused to let logistical support for the Antarctic
  156.    Program be charged to the DOD.  One consequence was to eliminate
  157.    any real growth in NSF research, which now goes up by only 6.2%.
  158.  
  159.    3. AND THINGS ARE GOING TO GET WORSE BEFORE THEY GET BETTER.  The
  160.    five-year budget agreement limits domestic discretionary spending
  161.    in FY 91 to $182.7B and $191.3B in FY 92, a growth rate of just
  162.    4.7%--and it drops to 3.7% the following year.  The "zero sum
  163.    game" is no longer a hypothesis.  Yet, even as it claps a lid on
  164.    discretionary spending, Congress continues on a wild earmarking
  165.    binge that is funding some of the world's wackiest projects.
  166.  
  167.    4. CONSIDER AN ALASKA SENATOR'S PROJECT TO HARNESS THE AURORA.
  168.    Sen. Ted Stevens proposes to capture the gigawatt or so of energy
  169.    in the electrojet formed by the interaction of the solar wind
  170.    with Earth's magnetic field.  Is this really practical?  Is it
  171.    ever!  The Geophysical Institute of the University of Alaska is
  172.    getting about $10M per year in pork-barrel research funds and now
  173.    Stevens has tossed in a $25M supercomputer center.  Actually, the
  174.    Geophysical Institute director seems to think they are developing
  175.    a new communications system in which the aurora borealis would
  176.    serve as a gigantic antenna for low-frequency radio transmission.
  177.    But why straighten the Senator out?  Let the good times roll.
  178.  
  179.    5. GORDON & BREACH CASE DISMISSED BY GERMAN APPEALS COURT.  APS,
  180.    AIP and Henry Barschall were sued by G&B over a survey of cost
  181.    effectiveness of physics journals. G&B, which came out on bottom,
  182.    claimed the survey was biased.  A lower court dismissed the case,
  183.    but G&B appealed--and lost again.  Martin Gordon, G&B Chairman,
  184.    claimed moral victory, but must have had difficulty with German.
  185.    Harry Lustig, APS Treasurer, who represented APS and AIP at the
  186.    Frankfurt hearing, observed that "we wish them the same success
  187.    in Switzerland and France," where G&B has filed similar suits.
  188.  
  189.    Robert L. Park  CMR@AIP.BITNET      The American Physical Society
  190.  
  191. ------------------------------
  192.  
  193. Return-path: <space-request+@andrew.cmu.edu>
  194. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  195. Resent-Date:  Mon, 05 Nov 90 08:26:02 EST
  196. Resent-From: Harold Pritchett <HAROLD@uga.cc.uga.edu>
  197. Resent-To: Space discussion group <space+@andrew.cmu.edu>
  198. Date:         Sat, 03 Nov 90 18:49:25 CST
  199. From: Steve Davis <S77175DS%ETSUACAD.BITNET@uga.cc.uga.edu>
  200. Subject:      Clarify Acronyms
  201. To: Space list <SPACE@FINHUTC>
  202.  
  203. This message was originally submitted by S77175DS@ETSUACAD to the SPACE list at
  204. FINHUTC. If you simply forward it back to the list, it will be distributed with
  205. the paragraph you are now reading  being automatically removed. If you edit the
  206. contributions you receive into a digest, you will need to remove this paragraph
  207. before mailing  the result to the  list. Finally, if you  need more information
  208. from the author of this message, you should be able to do so by simply replying
  209. to this note.
  210.  
  211. ------------------ Message requiring your approval (6 lines) ------------------
  212.  
  213. Would those who submit to this list please remember that there are
  214. people like myself who are not familiar with all the acronyms being
  215. used? When acronyms are used would you parenthisize the meaning of
  216. each letter at least once? Many already do this, but some mail is
  217. meaningless when it is not done.
  218.  
  219. ------------------------------
  220.  
  221. Return-path: <space-request+@andrew.cmu.edu>
  222. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  223. Date: 5 Nov 90 04:25:02 GMT
  224. From: crash!orbit!pnet51!schaper@nosc.mil  (S Schaper)
  225. Organization: People-Net [pnet51], Minneapolis, MN.
  226. Subject: Re: You Can't Expect a Space Station to be Cheap
  227. Sender: space-request@andrew.cmu.edu
  228. To: space@andrew.cmu.edu
  229.  
  230. -40*F with a wind chill off the scale (more than -80* can't be measured
  231. because
  232. human skin freezes too rapidly to measure) sure is interesting. 
  233.    I just discovered that I live further north than Henry, and I'm in the
  234. lower fourty-eight.
  235.       What _am_ I doing up here?   :-)
  236.  
  237. On the other hand, I don't usually worry about a piece of space debris coming
  238. through the roof and exposing me to the prairie winds in January.
  239.  
  240. Zeitgeist Busters!
  241.  
  242. UUCP: {amdahl!bungia, uunet!rosevax, chinet, killer}!orbit!pnet51!schaper
  243. ARPA: crash!orbit!pnet51!schaper@nosc.mil
  244. INET: schaper@pnet51.cts.com
  245.  
  246. ------------------------------
  247.  
  248. Return-path: <space-request+@andrew.cmu.edu>
  249. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  250. Date: 5 Nov 90 18:46:01 GMT
  251. From: usc!elroy.jpl.nasa.gov!jato!mars!baalke@ucsd.edu  (Ron Baalke)
  252. Organization: Jet Propulsion Laboratory, Pasadena, CA.
  253. Subject: Re: Galileo Update - 11/02/90
  254. References: <1990Nov2.225442.8608@jato.jpl.nasa.gov>, <4680@cvl.umd.edu>, <1990Nov3.050407.1642@zoo.toronto.edu>
  255. Sender: space-request@andrew.cmu.edu
  256. To: space@andrew.cmu.edu
  257.  
  258. In article <1990Nov3.050407.1642@zoo.toronto.edu> henry@zoo.toronto.edu (Henry Spencer) writes:
  259. >In article <4680@cvl.umd.edu> herve@cvl.UUCP (Jean-Yves Herve') writes:
  260. >>There is just one little thing that bugs me: how come the Galileo are given
  261. >>with funny units only, while the Ulysses report have both metric and funny
  262. >>units?
  263. >
  264. >Probably because Ulysses is a European project and hence the European
  265. >audience is being considered.  Unless I miss my guess, the numbers from
  266. >JPL et al are metric, and the NASA PR people are translating them for the
  267. >Great Unwashed... but for mostly-European projects they are constrained
  268. >to also supply civilized units.
  269.  
  270. Ulysses is a joint mission between NASA and the European Space Agency, so the
  271. units are given in both miles and the funny metric units :-).
  272.       ___    _____     ___
  273.      /_ /|  /____/ \  /_ /|
  274.      | | | |  __ \ /| | | |      Ron Baalke         | baalke@mars.jpl.nasa.gov
  275.   ___| | | | |__) |/  | | |___   Jet Propulsion Lab | baalke@jems.jpl.nasa.gov
  276.  /___| | | |  ___/    | |/__ /|  M/S 301-355        |
  277.  |_____|/  |_|/       |_____|/   Pasadena, CA 91109 |
  278.  
  279. ------------------------------
  280.  
  281. Return-path: <space-request+@andrew.cmu.edu>
  282. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  283. Date: 5 Nov 90 19:12:00 GMT
  284. From: uceng!minerva!dmocsny@iuvax.cs.indiana.edu  (Daniel Mocsny)
  285. Organization: University of Cincinnati, Cin'ti., OH
  286. Subject: Re: Replacement and Insurance Costs
  287. References: <1494.27343C70@ofa123.fidonet.org>
  288. Sender: space-request@andrew.cmu.edu
  289. To: space@andrew.cmu.edu
  290.  
  291. In article <1494.27343C70@ofa123.fidonet.org> Wales.Larrison@ofa123.fidonet.org (Wales Larrison) writes:
  292. >  So what was the real replacement cost of a lost shuttle mission?  
  293. >Replacement costs are orbiter (assume $1.5 billion), lost ET, lost 
  294. >SRBs, lost SSMEs.  ET costs are in the vicinity of $25 M.  SRB cases 
  295. >(not the propellent) are about $25 M per shipset (two complete sets 
  296. >of segments and components). SSMEs are more expensive - a shipset of 
  297. >SSMEs costs about $150 M.   Total of about  $1.7 B.  Which is about 
  298. >1/2 of the "3,000,000,000.00" being bandied around.  
  299.  
  300.  
  301. I have a question (not an assertion):
  302.  
  303. When the next shuttle accident occurs, what will be the likelihood
  304. that the disaster will result from another generic flaw that grounds
  305. the program for an extended period?
  306.  
  307. The MTTR (mean time to repair) is probably an important (hypothetical)
  308. statistic to consider with shuttle accidents. The money spent to sustain 
  309. an idle program during the repair interim might be considered a
  310. legitimate part of "replacement cost". Also, the time value of idle
  311. assets should be taken into account (i.e., all the expensive hardware
  312. that takes a two-year vacation). 
  313.  
  314. If NASA can recover from the next shuttle disaster within a few months,
  315. and keep up with its launch commitments, then the cost for the lost 
  316. shuttle is roughly its purchase price. But if the program goes down 
  317. for 2 years, the overall loss is probably far in excess of the purchase 
  318. price of the shuttle.
  319.  
  320.  
  321. --
  322. Dan Mocsny                Snail:
  323. Internet: dmocsny@minerva.che.uc.edu    Dept. of Chemical Engng. M.L. 171
  324.       dmocsny@uceng.uc.edu        University of Cincinnati
  325. 513/751-6824 (home) 513/556-2007 (lab)    Cincinnati, Ohio 45221-0171
  326.  
  327. ------------------------------
  328.  
  329. Return-path: <space-request+@andrew.cmu.edu>
  330. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  331. Date: 6 Nov 90 01:45:15 GMT
  332. From: bu.edu!dartvax!eleazar.dartmouth.edu!guy@bloom-beacon.mit.edu  (Guy A. Schiavone)
  333. Subject: USAF Robots on the Moon
  334. Sender: space-request@andrew.cmu.edu
  335. To: space@andrew.cmu.edu
  336.  
  337.  
  338.  In the November 1990 "IEEE Spectrum" there is an article that contains the
  339. sentence: "The U.S. Air Force, in its Project Forecast II report, offers
  340. dozens of initiatives to maintain military supremacy, including 'electronic
  341. associates' to aid pilots and the possible stationing of robots on the
  342. moon." (pg. 32)
  343.   I am intrigued by the part about robots on the moon.  Can anyone shed
  344. any further light on this?  Robots on the moon for what purpose?  Why on
  345. the moon instead of in orbit?  How close is this idea to being put into
  346. action?  Any answers (or speculations) would be appreciated.
  347.  -Guy Schiavone                 guy.schiavone@eleazar.dartmouth.edu
  348.  
  349. ------------------------------
  350.  
  351. Return-path: <space-request+@andrew.cmu.edu>
  352. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  353. Date: 5 Nov 90 15:48:50 GMT
  354. From: mojo!SYSMGR%KING.ENG.UMD.EDU@mimsy.umd.edu  (Doug Mohney)
  355. Organization: The U. of MD, CP, CAD lab
  356. Subject: Re: You Can't Expect a Space Station to be Cheap
  357. References: <0093F1DA.1F2A5920@KING.ENG.UMD.EDU>, <1990Nov3.225832.20332@zoo.toronto.edu>, <0093F2DB.F2D56F60@KING.ENG.UMD.EDU>,<29216@boulder.Colorado.EDU>
  358. Sender: space-request@andrew.cmu.edu
  359. To: space@andrew.cmu.edu
  360.  
  361. In article <29216@boulder.Colorado.EDU>, serre@boulder.Colorado.EDU (SERRE GLENN) writes:
  362.  
  363. >Actually, the question that bothers me most about both the NASA and the 
  364. >LLNL station is "Why so big?"  Since we (the U.S.) seem to have little, if any,
  365. >usable experience in launching, assembling, operating, and maintaining space
  366. >stations, it seems to me that we would want to start small and build up 
  367. >incrementally.  Like, first we launch a 86' x 16' 8" (this is the max. size of
  368. >a Titan IV Payload fairing, by the way) lab, then stick another one on the 
  369. >first, ...  Personally, I think we should can both the NASA and the LLNL 
  370. >stations and start small. 
  371.  
  372. I think the latest mandated redesign by Congress emphasizes a smaller,
  373. incremental approach; something like putting up the microgravity research block
  374. up there first as a stand-alone design, and adding other modules as you go, as
  375. well as making Fred less dependent on shuttle.
  376.  
  377. ------------------------------
  378.  
  379. Return-path: <space-request+@andrew.cmu.edu>
  380. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  381. Date: 5 Nov 90 23:14:34 GMT
  382. From: usc!julius.cs.uiuc.edu!wuarchive!zaphod.mps.ohio-state.edu!uwm.edu!ogicse!unicorn!n8035388@ucsd.edu  (Worth Henry A)
  383. Organization: Western Washington Univ, Bellingham, WA
  384. Subject: Re: Replacement and Insurance Costs
  385. References: <1494.27343C70@ofa123.fidonet.org>, <6640@uceng.UC.EDU>
  386. Sender: space-request@andrew.cmu.edu
  387. To: space@andrew.cmu.edu
  388.  
  389. >In article <1494.27343C70@ofa123.fidonet.org> Wales.Larrison@ofa123.fidonet.org (Wales Larrison) writes:
  390. >
  391. >I have a question (not an assertion):
  392. >
  393. >When the next shuttle accident occurs, what will be the likelihood
  394. >that the disaster will result from another generic flaw that grounds
  395. >the program for an extended period?
  396. >
  397.     Even if the accident is unrelated to any generic flaw, expect the
  398. fleet to be grounded for at least six months while various review boards
  399. and Congress (opps, nearly forgot the press) determine the probable 
  400. cause; depends a lot on how long it takes everyone to reach a concensous.
  401.  
  402.     Additionally, even if it is determined that the accident was unrelated 
  403. to any generic flaw, the review process would likely result in "safety
  404. upgrades" that would result in further delays. There is also a very real 
  405. possibility that the resulting political firestorm would result in the 
  406. permanent grounding of the fleet. :-( 
  407.  
  408.     Our pioneer ancestors must think us such ungrateful wimps, to simply
  409. survive, yet alone carve out a nation, they faced more risk on a regular
  410. basis than we are prepared to allow a few informed volunteers to face 
  411. today -- despite the potential gain, despite the infrequency, despite
  412. mankind's instinctive need to explore and pioneer.
  413.  
  414. ------------------------------
  415.  
  416. End of SPACE Digest V12 #531
  417. *******************
  418.